PROJECT PORTFOLIO
Delivering High-Performance Infrastructure Across the Globe
Executing Large-Scale Infrastructure with Precision
Ongoing Projects
We are actively managing a diverse portfolio of critical utility projects, spanning thousands of kilometers of grid expansion and high-voltage substation construction.
FEATURED PROJECT
Supporting Electricity Supply Reliability Improvement Project - Package 04
This project entails the design, construction, and commissioning of 262.2 km of 33kV Double Circuit lines, including 1,147 towers and 13 gantries, to enhance regional power capacity and reliability.
The project comprises the development of an 80MW solar power plant in Hambantota, Sri Lanka, including the construction of the associated substation and grid connection facilities. The scope covers the design, supply, installation, testing, and commissioning of the solar PV plant, collector substation, and transmission infrastructure required to evacuate power to the national grid, in compliance with CEB requirements, grid codes, and applicable environmental and safety standards.
We implemented advanced Helical Anchor Foundation technology for 33kV Distribution lines with 95 Nos. of doulble circuit distribusion towers with ACSR Lynx & AAAC Sycamore conductor. This innovative anchoring method ensures superior stability in challenging terrain while significantly reducing project lead times. For the first time in Sri Lanka, Ceylon Energy manufactured helical anchors locally and deployed helical products and technology for tower line foundations under the Electricity Supply Reliability Improvement Project (SESRIP). This milestone demonstrates our commitment to modern engineering practices, localized manufacturing capability, and enhanced grid reliability.
The Kenya SEZ Galvanized Steel Tower Manufacturing Plant Project spans 2.41 hectares (5.96 acres), providing ample space for current operations as well as future expansion. The project is supported by a 50-year secured land lease, ensuring long-term operational continuity and stability. The facility is designed with a production capacity of 18,000 metric tons per annum for galvanizing and 15,000 metric tons per annum for steel fabrication, with a scalable layout that allows for future capacity enhancements. Leveraging Ceylon Energy’s proven competencies in infrastructure project delivery, the plant is expected to be completed within two years, enabling the project to realize maximum operational and commercial benefits.
A Legacy of Field-Proven Engineering Success
Completed Projects
We have successfully delivered over 40 major infrastructure projects, establishing a 7+ year track record of reliability and technical excellence.
Powering Sri Lanka’s Future Together
Need Help?
Frequently asked questions
Leveraging over 7 years of excellence in global energy infrastructure, we address the complex challenges of modern power transmission. Explore our common inquiries to learn how we integrate advanced global technology and sustainable innovation to light people’s lives across Asia, Africa, and beyond.
What is our expertise in power transmission?
We handle all aspects of the project lifecycle, from design and planning to execution and commissioning of large-scale projects.
Do we offer renewable energy consultancy?
Yes, we specialize in detailed technical audits, energy usage reports, and overseeing the installation of renewable energy systems.
Where does Ceylon Energy operate?
Originally a leader in Sri Lanka, we have established ourselves in Africa and are expanding rapidly into Western and Asian markets.
How do we ensure grid reliability?
We ensure grid reliability by integrating world-class technology like ACLARA Grid Monitoring for real-time fault detection and management. Our use of innovative Helical Anchor technology provides stable foundations, while our large-scale network improvements serve over 493,000 consumers with a quality electricity supply.