Project SESRIP - Package 04

Powering Reliability through Scalable Distribution Excellence

Project
Overview

The project involves the construction of 33kV Double Circuit (D/C) tower lines and gantries to enhance the reliability and capacity of the electricity distribution network. The scope covers the construction of 15 tower lines, 13 gantries, and 1,147 transmission towers over a total line length of 262.2 km, including all associated design, civil, erection, stringing, testing, and commissioning works in compliance with applicable technical, safety, and environmental standards.

0+

Power Lines Planned

0

Gantries Planned

$0M+

Project Investment

Distribution
Lines

Our team is dedicated to engineering the future of energy through the design and implementation of sustainable infrastructure. This section provides a transparent overview of our extensive network of 33kV Double Circuit Distribution Lines, highlighting our commitment to technical precision and regional connectivity.

Below, you can monitor the real-time status of our utility milestones, ranging from successfully energized routes like Maho and Ampara to our active developments currently in progress. We invite you to explore the table for a detailed breakdown of each project’s location, capacity, and current operational standing.

#
Distribution Line
Voltage
Status
L3
Maho GSS to Ma-Eliya Gantry Double Circuit
33kV
Completed
L6
Ampara GSS to Uhana Gantry Double Circuit
33kV
Completed
L2
Mallawapitiya GSS to Ratmalgoda Double Circuit
33kV
Completed
L4
Kappalthurei Gantry to 6th Mile Post Gantry Double Circuit
33kV
Completed
L7
Wimalasurendra GSS to Maskeliya Gantry Double Circuit
33kV
Completed
L11
Mahiyanganaya GSS to Bibila Double Circuit
33kV
Completed
L14
Morawaka Gantry to Warukandeniya Gantry Double Circuit
33kV
Completed
L1
Puttlam GSS to Keeriyankalliya Double Circuit
33kV
In Progress
L5
Irankkandy Gantry to Kumuburupitiya Gantry Double Circuit
33kV
In Progress
L8
Choicy Gantry to Thawalanthenna Double Circuit
33kV
In Progress
L9
Kegalle GSS to Gevilipitiya Gantry Double Circuit
33kV
In Progress
L10
Badulla GSS to Ella Double Circuit
33kV
In Progress
L12
Ratnapura GSS to Idangoda Double Circuit
33kV
In Progress
L13
Monaragala GSS to Wellawaya Double Circuit
33kV
In Progress
L15
Elpitiya Gantry to Mattaka Gantry Double Circuit
33kV
In Progress

Gantry
Development

Our infrastructure development extends to the strategic deployment of advanced switching gantries, which are essential for maintaining the stability and flexibility of the regional power grid. This section highlights our portfolio of 33 kV Switching Gantries (2SSBB), designed to provide robust control and reliable load management within our energy networks.

The following table provides a comprehensive update on our gantry installations, categorized by their current operational status. You can review the details of our fully commissioned sites, such as the Rathmalgoda and Maeliya gantries, as well as the ongoing progress at our active construction locations including Keeriyankalliya and Maskeliya.

#
Gantry
Voltage
Status
G2
Rathmalgoda Switching Gantry (2SSBB)
33kV
Completed
G3
Maeliya Switching Gantry (2SSBB)
33kV
Completed
G5
Uhana Switching Gantry (2SSBB)
33kV
Completed
G6
Irakkandy Switching Gantry (2SSBB)
33kV
Completed
G7
Kumburupitiya Switching Gantry (2SSBB)
33kV
Completed
G8
Ella Switching Gantry (2SSBB)
33kV
Completed
G9
Bibile Switching Gantry (2SSBB)
33kV
Completed
G1
Keeriyankalliya Switching Gantry (2SSBB)
33kV
In Progress
G4
Maskeliya Switching Gantry (2SSBB)
33kV
In Progress
G10
Wellawaya Switching Gantry (2SSBB)
33kV
In Progress
G11
Morawaka Switching Gantry (2SSBB)
33kV
In Progress
G12
Mattaka Switching Gantry (2SSBB)
33kV
In Progress